In TxDOT Project 6100 the following aspects of the system were investigated:
In the video below, Corner One of our first precast overhang bridge deck is tested to failure:
- Response of the constructed bridge deck system to load
- Development of an adjustable haunch gasket
- Evaluation of grouts to fill the haunch
- Verification of the shear connector strength
In the video below, Corner One of our first precast overhang bridge deck is tested to failure:
Research Video from Tyler Ley on Vimeo.
Photographic archives can be found below. Results from testing are available on the publications page.
Bridge Deck Construction:
Bridge Deck Pour:
Bridge Deck Testing: